PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Started Backfilling and compacting the Electrical and the Sprinklers Room Facing South-East (800x600).jpg Started stripping the shear wall panels at Elev. 4-Stair -2 (4th Floor) Facing South-West (800x600).jpg Backfilling and compacting on the left side of the bridge by the Administration Building (800x600).jpg Finished installing the conduit for the Tele-Data at the bridge by the Administration Building  (800x600).jpg Pulling strings for the Tele-Data wires at the manhole (800x600).jpg Stripping the shear wall panels at Elev. 4-Stair -2 (4th Floor) Facing South (800x600).jpg